Laserfiche WebLink
` a^.~ <br />-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: NOV ~-~-0(~~ <br />NATURE OF VIOLATION: <br />FAILURE TO PASS ALL DISTURBED AREA DRAINGE THROUGH A SEDIMENTATION POND, A SERIES <br />OF SEDIMENTATION PONDS, OR A TREATMENT FACILITY BEFORE LEAVING THE PERMIT AREA. <br />FAILURE TO MAINTAIN SEDIMENTATION PONDS AND ASSOCIATED DIVERSIONS AND CULVERTS. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) 120(2)(i)(Ii)(A)(B), 121(2)(i)(II), 125(9)(b), 4.05.2(1) and <br />REGULATION <br />SECTION(S) 4.05.2(2), 4.05.3, 4.05.6 <br />PERMIT <br />SECTION(S) 5.3.4, Exhibit V-3, Maps 8009-51 thru 519 <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />ALL DISTURBED PORTIONS OF THE PERMIT AREA WITH SPECIAL EMPHASIS ON THE AREAS <br />THAT DRAIN INTO PONDS 15-F2 (15-P2 DRAINAGE A?lEA) A.*1D THE AERA T1L1T DiiAIPIS INTO <br />POND 15-P-1(15-P1 DRAINAGE AREA). ALL SEDIMENTATION PONDS AND ALL DISTURBED <br />AREA DRAINAGE DIVERSIONS WITH SPECIAL EMPHASIS ON 15-D1, 15-D2 AND 15-D3 AND <br />ASSOCIATED CULVERTS. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />1. DIRECT DISTURBED AREA DRAINAGE INTO APPROPRIATE SEDIMENTATION PONDS VIA <br />PROPERLY DESIGNED DIVERSIONS AND CULVERTS. <br />2. REPAIR AND MAINTAIN ALL SEDIMENTATION PONDS TO DESIGN STANDARDS AS APPROVED <br />IN PERMIT N0. C-81-048 <br />3. REPAIR AND MAINTAIN DIVERSIONS AND CULVERTS AS APPROVED IN PERMIT C-81-048. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE SEPTEMBER 10 19 91 <br />Doc. 0221E (10/90) <br />VIHITE - File YELLOW - Operator PINK -Specialist <br />