Laserfiche WebLink
~- C'N~yl <br />(sue STATE OF COLOIZ~DO <br />OFFICE OF THE STATE ENGINEER <br />Division of Wa[er Resources p <br />^ <br />~ \ 1~ P'l <br />Department of Natural Resources ~ <br />~ <br />p~ ~d 1! dJ <br /> <br />1313 Sherman Street, Room 818 pU6 2 4 2006 <br />Denver, Colorado 80203 <br />phone (303) 866-3581 <br />FAX (303) 866-3589 <br />_,,.,n Division of Reclamation, <br />' <br /> pv Mining and Safety <br />www.water.state.co.us <br />Response to Reclamation Permit Application Consideration <br />DATE: August 24, 2006 <br />TO: Deb E. Gonima, Environmental Protection Specialist <br />CC: Division 1 Office, District 1 Water Commissioner <br />FROM: loana Comaniciu, E.I.T <br />RE: Nickell Gravel Pit, File No. M-1994-077 <br />Operator: Board of County Commissioner-Washington County <br />Contact: Larry Champ - {970)-383-2216 <br />Section 30, Twp 5 South, Rng 55 West, 6th P.M., Washington County <br />~~~~ c~~ <br />} rB98 Y <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D, Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The application is submitted for a conversion from an existing 110 gravel pit containing 9.42 acres to a <br />112 gravel pit, which would contain 58.53 acres for a total of 67.95 acres. The proposed operation as <br />indicated in the original 110 permit does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^reclamation, <br />^water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a weN permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industria! use. Applicant should contact the <br />water commissioner for further information. <br />^ The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the water was diverted in priority under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions, <br />