Laserfiche WebLink
. i <br /> <br />BEFORE THE MINED LAND RECLAMATION 8OARD <br />DEPARTMENT OF NATURAL RESOURCES <br />STATE OF COLORADO <br />ORDER SCHEDULING MATTER FOR RECONSIDERATION <br />ERNEST R. DAKOLIOS, WANDA E. DAKOLIOS and <br />DAKOLIOS CONSTRUCTION CO., INC. <br />THIS MATTER comes before the Mined Land Reclamation Board <br />("Board") upon the operators' motion for reconsiderati n, and <br />upon a stipulation entered into by the Mined Land Recl ation <br />Division ("Division") and the operators. The Hoard her by orders <br />that: <br />1. This matter shall be scheduled for reconsider tion at <br />the Auqust 1991 Board meeting if the operators first su mit addi- <br />tional proof of financial warranty in the amount of $13 ,700.00, <br />thereby bringing the total reclamation bond on the site to <br />$152,250.00. <br />2. Upon the filing of such additional financial arranty, <br />in a form acceptable to the Division, the operators may resume <br />mining operations at the site. <br />3. The operators may perform reclamation activit <br />site before any additional bond is submitted, however s <br />ations shall be strictly limited to activity that will <br />reclamation liability at the site. <br />Dated this ~~f-day of July 1991. <br />COLORADO MINED LAND RECLAMA <br />DEPARTMENT OF NATURAL RESOD <br />es at the <br />ch oper- <br />educe the <br />ION BOARD <br />CHRIS JOUFy~S, chairman <br />Mined Lan Reclamation Boar <br />