Laserfiche WebLink
ay <br />Mr. Richard T. Raines <br />April 2, 2001 <br />Page 3 <br />3. Approval of this plan ~s for the purposes as stated herein. Any additional uses for this <br />water must frst be approved by this office. Any future additional historic consumptive <br />use credit given (e.g.. agricultural water transfer) for this site must consider all <br />previous credits given. <br />4. All pumping for dust control shall be measured in a manner acceptable [o the Division <br />Engineer. <br />5. Adequate accounting of depletions and replacements (in acre-feet) must be provided <br />to the Water Commissioner and/or Division Engineer on forms and at times <br />acceptable to both of them. The accounting form(s) shall be sufficient to demonstrate <br />that the net effective replacement equaled or exceeded the total depletion on a <br />monthly basis. All replacement water must be concurrent with depletions In quantity, <br />timing and location, except that releases aggregated at the discretion of the Division <br />Engineer may occur in a later month than the depletions. Said accounting must be <br />received by the 10`" of the month following the reporting period. <br />6. The name, mailing address, and phone number of the contact person who will be <br />responsible for operation and accounting of this plan rrwst be provided on the <br />accounting farms to the Division Engineer and Water Commissioner. <br />7. The approval of this substitute water supply plan does not relieve the Applicant and/or <br />landowner of tho requirement to obtain a water Court decree approving a permanent <br />plan for augmentation or mdigahon to ensure the permanent replacement of all <br />depletions, Including long-term evaporatlon losses after gravel mining operations have <br />ceased. If reclamation of the mine site will produce a permanent water surface <br />exposing groundwater to evaporation, an applicatirm for a plan for augmentation must <br />be filed with the Division 1 Water Court at least three (3) years prior to the completion of <br />mining to include, but not be limited to, long-term evaporation losses. If a lined pond <br />results after reclamation, replacement of fagged depletions shall continue until there is <br />no longer an effect on stream Flow. <br />8. This plan is valid through March 31, 2003, unless athervvise revoked or modified. <br />9. This substitute water supply plan may be revoked or modified ai any time should it 6e <br />determined that injury to other water rights has or will occur as a result of This plan. <br />10. If this plan will not be made absolute by a water court action by the plan's expiration <br />date, a renewal request must be submitted to this office with the regwred statutory fee <br />(currently 52171 at least 45 days prior to the expiration date of this plan (by February 14, <br />2003j. <br />11. Should this substitute water supply plan expire wihout renewal or be revo<ed prior to <br />adjudication of a permanent plan for augmentation, all excavation of product From below <br />the water table, and all other use of water at the pit, must cea:;e immediately. <br />