Laserfiche WebLink
-. <br /> <br />BEFORE THE MINED LAND RECLAMATION BOARD <br />DEPARTMENT OF NATURAL RESOURCES <br />STATE OF COLORADO <br />ORDER SCHEDULING MATTER FOR RECONSIDERATION <br />ERNEST R. DAKOLIOS, WANDA E. DAKOLIOS and <br />DAKOLIOS CONSTRUCTION CO., INC. <br />THIS MATTER comes before the Mined Land Reclamation Board <br />("Board") upon the operators' motion for reconsiderati n, and <br />upon a stipulation entered into by the Mined Land Recl mation <br />Division ("Division") and the operators. The Board he eby orders <br />that: <br />1. This matter shall be scheduled for reconside ation at <br />the August 1991 Board meeting if the operators first s bmit addi- <br />tional proof of financial warranty in the amount of $1 4,700.00, <br />thereby bringing the total reclamation bond on the sit to <br />$152,250.00. <br />2. Upon the filing of such additional financial warranty, <br />in a form acceptable to the Division, the operators ma resume <br />mining operations at the site. <br />3. The operators may perform reclamation activi <br />site before any additional bond is submitted, however <br />ations shall be strictly limited to activity that will <br />reclamation liability at the site. <br />Dated this ~ ~~day of July 1991. <br />COLORADO MINED LAND R. <br />DEPARTMENT OF NATURAL <br />r <br />ies at the <br />uch oper- <br />reduce the <br />ON BOARD <br />CHRIS JOUF , chairman <br />Mined Lan Reclamation <br />