My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-19_REVISION - M1998003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998003
>
2006-07-19_REVISION - M1998003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:44 PM
Creation date
11/21/2007 11:38:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998003
IBM Index Class Name
Revision
Doc Date
7/19/2006
Doc Name
S.O. Bond Calculation
From
DMG
To
Files
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CiRCES Cost Estimatino Software <br />Task # : 001 <br />Date : 07/19!1006 <br />User : DEG <br />State :Colorado PenniUjob# : h1-1998-003 <br />County :Moffat Abbreviation :none <br />Site : Raftopoulos Pit #1 Filename : M003-001 <br />Agency or organization name :DMG <br />Pertnk or other job action :Succession of Operators Bond Calculation <br />Task description :Regrade Disturbed Area to 4h:1v Slt <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes ll - 8SU (200t Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosOhour : $58.24 NA <br />OperaBngcosUhour : $73.75 100 <br />Ripperap.cosUhour : $3.43 50 <br />Operator cosOhour : $32.78 NA <br />Total unit casOhour : $188,20 Total fleet cost/hour : ;168.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 BCY factor : 1.330 volume : 6,850 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br />Average push distance : 60 feet <br />Unadjusted howdy production : 1,246.9 LCY1hr <br />Material consistency descdption <br />Compacted fill or embankment <br />Average push gradient: 5.00 % Q <br />Average site altitude : 6,100 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : 1.00 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.11 <br />A18tude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.53 <br />Adjusted unit production : 858.94 LCY/hr <br />Adjusted fleet production : 858.94 LCY/hr <br />JO8 TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 10.09 Hours <br />Unit cost : $0.255 /LCY Total job cost : 51,897 <br />
The URL can be used to link to this page
Your browser does not support the video tag.