My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-19_REVISION - M1998003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998003
>
2006-07-19_REVISION - M1998003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:44 PM
Creation date
11/21/2007 11:38:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998003
IBM Index Class Name
Revision
Doc Date
7/19/2006
Doc Name
S.O. Bond Calculation
From
DMG
To
Files
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine ~ Total ~ Fleet Size Haul Trip Retum Trip <br />-Light Duty Pickup, 4x2, 1/2 T. $29.81 <br />-Fuel Tenker, 4x2, 170 HP $64.11 <br />units) CosUhr/fleet CosUhr/fleet <br />1 $29.81 $29.81 <br />1 $84.11 $64.11 <br />Subtotals <br />EQUIPMENT HAUL DISTANCE and TIME <br />593.92 <br />Nearest major city or town within project area region : Craig <br />Transportation Cycle Time : Non- Total one-way travel distance : 70.0 miles <br />Roadable Roadable Average travel speed : 35.0 mph <br />Haul time (hours) = 2.00 2.00 <br />Return time (hours) = 2.00 2.00 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 5.00 4.00 <br />Total non-roadable mob/demob cost' <br />'two rountl trips wiN haul rig <br />Total roadable mob/demob cost " <br />"one round trip, no haul dg <br />$5,884.94 <br />$375.66 <br />JOB TIME AND COST Total job time : 10.00 hours <br />Total job cost : 56.261 <br />__ <br />
The URL can be used to link to this page
Your browser does not support the video tag.