Laserfiche WebLink
<br /> <br /> <br />Sincerely, <br />Scott Smith, Pres. <br />Pathfinder Development Inc. <br />PS. I failed to list two other items as discussed: <br />1)The Southway TR for concrete hatching, asphalt hatching, washing ponds, etc. in <br />the Southeast portion of the permitted area is now recognized as a vested approval, per <br />our discussion. Md... <br />2) Within 30 days, Pathfinder shall provide a detailed survey of available stockpiles, <br />on-site reserves, or off-site sources of topsoil. This survey shall address: <br />a) the sufficiency of the reserves. <br />b) any available or relevant documentation. <br />