Laserfiche WebLink
:-~ <br /> <br />June 21, 1984 <br />Zigan Sand & Gravel <br />RE: Snowstorm Placer <br />I. Costs from Plan (Exhibit L) $11,022.00 <br />II. *1 Top]soil Replacement <br />18 ac x 43,560 sq ft/ac x 1 ft topsoil x $1 cu yd = $20,040.00 <br />27 cu vds <br />III. Mulch <br />Material <br />2 tons/ac = $300 ac x 18 = $ 5,400.00 <br />Labor - Tractor power mulcher and crimper <br />85.71 hr 4 ac/hr <br />18 ac - 4 ac/hr = 4.5 x $85.71 hr = $ 343.84 <br />IV. Fertilizer <br />P205 at 100 lb/ac x .15d 16 x 18 ac = $ 270.00 <br />11 at 1,500 lb ac x .09d/lb x 18 ac = $ 2,430.00 <br />