My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27416
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:03 PM
Creation date
11/21/2007 11:36:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Enforcement
Doc Date
12/15/1993
Doc Name
SIGNED SETTLEMENT AGREEMENT
Violation No.
CV1993131
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:: <br />iii ii~iiiiiniiii~i <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department oI Natural Resources <br />1313 Sherman SI., Room 215 <br />Denver, CO 80203 <br />Phone: (303 866-3567 <br />FA%: (3031 832-8106 <br />Cessation Order No. <br /> <br />UEC 1 r5 i993 <br />f1:.:_ <br />SETTLEMENT AGREEMENT .., .,L , <br />of ~O~o <br />~d ~~ <br />Ne <br />••~~896~ <br />Roy Romer <br />Governor <br />Michael B. Long <br />Dwision Drteaor <br />Notice of Violation No. C-93-131 <br />Mine:Southfield Permit No. C-81-014 <br />Permittee: Energy Fuels Coal Inc. <br />Mailing Address:P.O. Box 449 Florence. CO 81226 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: Fremont Type of Mine: Underground/Private <br />The Mined Land Reclamation Division ("The Division") issued a certain <br />Notice of Proposed Amount of Civil Penalty, and the operator requested <br />a conference thereon, as authorized by C.R.S. 1973, 34-33-123(8). <br />The requested conference having been held as required by law, on <br />November 16.1993 the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be $S100.00 <br />2. The penalty shall be paid to the Division by the operator not <br />later than 30 days from the date thereof; <br />3. Payment of such penalty by the operator shall constitute a <br />waiver of all further rights to review of such penalty or of <br />the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator <br />within then days after the closing date of such conference, which date <br />is set forth below opposite the signature of the Conference Officer. <br />if not so signed, the Division will fix the penalty at whatever amount <br />it teems appropriate, based upon the factors referred to in C.R.S. <br />1973, 34-33-123(8)(d). <br />DATE: /9"T~`7 <br />c ~-ccE~/ Goa / <br />Operato <br />by <br />M, :,.er ~ nav,L, <br />DIVISION OF MINERALS AND GEOLOGY <br />DATE: d~-L. h )~°13 By <br />Penalty Adjustment Reviewed By <br />[Rule 5.04.3(4)(c)] <br />C.R.S. 34-33-123(8)(c)(d) <br />
The URL can be used to link to this page
Your browser does not support the video tag.