Laserfiche WebLink
<br />Henderson Mine Permit #77-342 <br />Technical Revision 4/4/88 <br />TABLE 1 <br />PROPOSED STOCKPILE SCHEDULE FOR HENDERSON <br />TAILING BASIN ,, t <br />~ . <br />Year Elevation Tailing Required Soil, Required Soil <br />(feet) Acreage Cumulative By Year <br />in MCY * in MCY <br />1992 8,747 750 0.61 0.14 a. <br />1995 8,757 817 0.66 0.05 <br />2000 8,772 870 0.70 0.04 <br />2005 8,786 914 0.74 0.04 <br />2010 8,798 985 0.79 0.05 <br />2015 8,809 1,040 0.84 0.05 <br />2020 8,820 1,105 0.89 0.05 <br />* MCY = million cubic yards <br />a. 0.47 MCY already stockpiled or placed <br />