My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27349
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:00 PM
Creation date
11/21/2007 11:35:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Enforcement
Doc Date
9/9/1981
Doc Name
NORTH THOMPSON CREEK MINES FN C-025-81
From
MLR
To
SNOWMASS COAL CO
Violation No.
CV1981036
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />page 4 <br />David C. Shelton <br />Director <br />3. Extent of damage - <br />Following the logic <br />conveyor is no[ run <br />few coal lanes were <br />2 is assigned. <br />S~nTe Or CO~ORnoO nic~~nnpn i4!~•e •~o• <br />DEPARTMENT OFNATURAt RESOURCES <br />D. Monte Pascoa, Execulrve D~reclor <br />MINLD LAND ItLCLAMATION <br />423 Centennial Bwlding, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />above, exeent of damage should be small if the <br />until splash pans are installed because very <br />observed below the conveyor. Thus, a value of <br />This results in an assessment of 12/64 x $1750 or $328 for seriousness. <br />4. Fault - <br />The Division feels that this violation occurred as the result <br />of intentional conduct by the operator, thus fits the category <br />of fault (5.04.5(2)(c)(iii)). The operator has been aware that <br />the splash pans must be installed prior to use of the mine H,3 <br />conveyor for more than one year. This was originally brought <br />up during the review of an ammendment to construct the unit <br />train loadout facility. Furthermore, [he operator was reminded <br />several times that the splash pans must be installed. During the <br />July inspection, the conveyor was observed [o be running, and <br />[he operator was advised then to install the splash pans. In <br />light of the period of time which the operator has had to <br />install the splash pans and the fact that the operator knew that <br />- these must be installed prior to use of the conveyor, an <br />assessment of $1,250 is made. <br />This brings the total assessment to <br />$ 1,250 for fault <br />$ 328 for seriousness <br />$ 150 for history of revious violations <br />$ 1 , 728 TOTAL Round to $1 , 725 - ~r rl~v <br />
The URL can be used to link to this page
Your browser does not support the video tag.