Laserfiche WebLink
<br />RECLAMATION COST ESTIMATE <br />This cost estimate is based on the following assumptions: <br />• 10 acres of stripped azea prior to mining <br />• 10 acres of active mining area (average ] 0' depth) <br />• 10 acres of backfilled area <br /> TASK UNIT OilANTITY PRICE TOTAL <br />1. Backfilling (10 ac.) 161,333 cy $1.00 $161,333.00 <br /> haul of up to 2000' <br />2. Topsoiling Disturbed Areas (30 ac.) 29,040 cy $1.00 $29,040.00 <br /> push of up to 500' <br /> avg. depth of 6" to 9" <br />3. Scarify Prior to Seeding 30 acres $100.00 $3000.00 <br />4. Seed and Mulch 30 acres $800.00 $24,000.00 <br /> TOTAL $217,373.00 <br />SUMMARY OF RECLAMATION COSTS <br />Desc~tion Item Cost <br />Disturbance Cost Total $217,373.00 <br />ContractorMOB/DEMOB(8%) $ 17,390.00 <br />Overhead (18.5%) $ 43,431.00 <br />Administrative (5.0%) $ 13,910.00 <br />Total Proposed Bond $292,104.00 <br />Disturbance Acreage 30 acres <br />Bond Cost per Acre $ 9736.80 <br />