Laserfiche WebLink
Recu-hurwN PLAN (coNr) <br />Axasoao ApAIL 2002 <br />Amendment # 8 - REVISED RECLAMATION TIMETABLE <br />ESTIMATED RECLAMATION TIMETABLE <br />(Amended April 2002) <br />Ex-aa~r E <br /> ACRES ± <br />Phase Years* Total Revegetation Roads, ind., <br />Comm, rip <br />rap & lakes Undis- <br />turbed <br />I 3-5 260.08 170.42 76.56 13.10 <br />g complete 20.75 0.00 0.00 20.75 <br />W complete 3.00 0.00 0.00 3.00 <br />X complete 4.28 0.00 1.56 2.72 <br />Y 3-5 1.30 0.00 1.30 0.00 <br />Z complete 2.66 0.00 1.75 0.91 <br />TOTAL 292.07 170.42 81.17 40.48 <br />" The numbers in th ie column refer to how long it will tnke to reclaim the area when mining <br />ends. Since reclamation rune concurrent with mining only the last area mined will need to be <br />reclaimed, not the entire arse of the Phaea. <br />21 <br />