My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-26_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2002-04-26_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:49 PM
Creation date
11/21/2007 11:34:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Revision
Doc Date
4/26/2002
Doc Name
Amendment Application
From
Albert Frei & Sons Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ExHien D <br />Mwwci Puw (coNT) <br />AN®m AiRZL 10U3 <br />To build this road a corridor, 1:1 slope from the road <br />surface up onto the surrounding hillsides will have to created as <br />explained in the Reclamation Plan. The cross hatched area on the <br />Mining Plan Map shows the limits of the disturbance area, the <br />road surface is shown as a dashed line and the perimeter line is <br />the top of the graded slope. The disturbed area covers approxi- <br />mately 3.28 ac. ±. The benches will be 10 foot high by 10 foot <br />wide to create a stable slope along the road. To accomplish <br />this, we will begin to remove material from the mine side of the <br />road cut and work south along the proposed route. As the road <br />progresses, the side slopes will be created and the waste rock <br />will be removed to the mine area where it will be processed. The <br />excavated benches will be resoiled and planted with native <br />grasses and shrubs during each phase of lowering the road. <br />Initially the road will be steeper than the 7$ from the <br />highway to the saddle midway thru the road corridor. This will <br />create a rather steep road for the first 300 feet and then level <br />out so it enters the quarry at the existing floor elevation. It <br />is estimated the road will be started nearly 80 feet above its <br />final height when construction begins. As the mine develops the <br />road will be gradually lowered so it enters the mine at the same <br />level as the floor. This lowering will continue until the final <br />mine floor elevation is established. During this time dust <br />control agents such as magnesium chloride will be used on the <br />road to control dust. The road, when finished, will be 60 feet <br />wide and have a 7~ slope so it is easily traversed. <br />amendment # 9 - SHOP BUILDING ADDITION <br />The approved ODP includes construction of a temporary shop <br />building on the site. This building will conform with County <br />requirements and will be built to their standards. Since the <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.