Laserfiche WebLink
.. <br />F'Ar~E 3 <br />As indicated ab~~ve, drainage ~=ontrols on site are Functional. Mr. <br />Price noted ne.=essary dit~.h maintenan..e at the culvert or.itlet area 1. <br />Cq ), This was discussed with Mr. }:uchta on site. Better positive <br />drainage needs to be established in this 1~}cation. <br />We noted the cr~al in the stockpile area dc.es not appear to be toxic <br />or acid producing material and the area drains to the sediment pond. <br />The portals are temporarily block sealed and secure as is the fan <br />location. <br />I discsussed the Federal coal lease status with Jerry Strahan, <br />BLM/Craig, CO. Mr. Strahan indicated the company is ~_urrently in <br />=ompliance with lease requirements. He estimated that appro:<. 50 '1. of <br />the leases had been mined. He also indicated that there are not other <br />=ontiquo~.is Federal leases available and -acres=_ t~~ ~~tF~~er Federal lease <br />areas from the mine wc~rl;ings was unli4::ely. TI-~i=_ was disc=u=_sed with Mr <br />Berry. <br />This concluded the inspert.ion. F'erfvrmance standards indicated as <br />n~:.t applicable d~~ nc~t e::i=_t ~~r~ site. <br />