Laserfiche WebLink
ro <br />-3- <br />Historv <br />The permlttee ha <br />currently under <br />These violations <br />history componen <br />s received two previous violations which are not <br />administrative review in the preceding calendar year. <br />were NOV's 83-31 and 83-32. The Division must assess a <br />t of (50.00 for each violation. <br />History Total: <br />II <br />Seriousness <br />S 100.00 <br />The Division views this violation primarily as a violation of the <br />administrative requirements of the permit. The Division feels that <br />enforcement of the performance standards was obstructed since the <br />permlttee had not provided proper designs, certification, and <br />information that the particular road to question would meet the <br />applicable performance standards. In the road's current constructed <br />configuration, the Division sees possible conflicts with the performance <br />standards involving haul road drainage, construction, certification, and <br />location. As noted previously, the Division feels that the permlttee <br />was well aware that such a road would need to be incorporated Into the <br />existing permit. For this reason the Division assesses a civil penalty <br />for seriousness of ;1,000.00. <br />Seriousness Total: <br />III <br />Fault <br />f1,000.00 <br />The Dl vision feels that this violation occurred as a result of actions <br />greater than negligence on the part of the permlttee. The Division <br />feels that the permlttee was aware that such a road must be permitted. <br />In this case the company knowingly constructed a haul road which had not <br />been approved by the Division For this reason the Division assesses a <br />E1,250.00 civil penalty for fault. <br />Fault Total: <br />Summary <br />History <br />Seriousness <br />fault <br />TOTAL <br />2f ,350.00 <br />Notice of Violation CV-84-029 <br />51,250.00 <br />This violation was written because the permlttee had not provided adequate <br />sediment control for an area of disturbance related to the operation. This <br />area does not have its drainage passing through a sediment pond or other <br />- f 100.00 <br />- (1,000.00 <br />- (1,250.00 <br />treatment facility. <br />