My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27176
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:53 PM
Creation date
11/21/2007 11:32:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
9/28/1992
Doc Name
BATTLE MTN RESOURCES INC 3RD PARTY CONTRACT
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
RCG HAGLER BAILLY INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i --~ <br />7.7 Contractor shall require all Subcontractors to obtain, mainta and keep in <br />force similar insurance coverage during the time they are engaged in perfo 'ng services <br />under this Agreement. All policies of Subcontractors shall include the waiver f subrogation <br />required in Paragraph 7.3. <br />Article 8 - Terminat~Qn and Stop Work <br />8.1 BMRI may, without prejudice to any other rights or remedy, arid upon giving <br />both DMG and Contractor written notice, terminate, in whole or in part, this Agreement <br />immediately and finish the terminated Work by whatever method BMRI, i~l consultation <br />with DMG, may deem appropriate. On receipt of such notice, Contractor sl}all, except as <br />and to the extent directed, immediately discontinue the Work and the placing of all orders <br />for materials, facilities and supplies in connection with the performance of the Work and, <br />if requested, shall make every reasonable effort to procure termination of existing <br />Subcontracts upon terms satisfactory to BMRI. Contractor may be instructed by DMG to <br />prepare and deliver to DMG and BMRI a final report respecting the Work. <br />8.2 Upon completion of the Work, as accepted by DMG an~1 BMRI, or <br />immediately upon receipt of the aforesaid of termination, Contractor shall deliver to BMRI <br />the following: <br />-17- <br />__ ,..~~_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.