Laserfiche WebLink
I ~ti <br />• • <br />(c) Any fines, penalties, or other amounts assessed against BMR}i by reason of <br />Contractor's failure to comply with all health, safety, and envirjonmental and <br />cultural resource protection laws and regulations applicable to the Work. <br />Article 6 -Subcontracts <br />6.1 Contractor shall retain, by way of a subcontract, an independent analytical <br />laboratory designated by the DMG with the concurrence of BMRI, to analyse all samples <br />taken pursuant to this Agreement, the MOU and the Scope of Work. Said independent <br />analytical laboratory will be a subcontractor to Contractor. <br />6.2 A "Subcontractor" is a person or entity who has entered into a written <br />agreement with Contractor or with a Subcontractor of Contractor to perfortm any of the <br />Work. Contractor shall not employ any Subcontractor without a written agreement and the <br />prior written consent of both DMG and BMRI. There shall be no contractuall relationship <br />between either DMG or BMRI and any Subcontractor with respect to the Work. Contractor <br />shall be as fully responsible to BMRI for the acts and omissions of any Subcontractor as <br />Contractor is for its own acts and omissions. <br />6.3 As between BMRI and Contractor, Contractor shall be responsible for the acts <br />and omissions of its Subcontractors and any portion of the Work perflormed by a <br />-13- <br /> <br />