Laserfiche WebLink
<br />February 19, 1985 <br />Trinidad Basin Inspection <br />Page Two <br />On the north face of pit 2 in Section 22, a small slump was noted. The <br />significance of this slump will be further evaluated during the spring and <br />summer months. The operator should plan to do repair activities on this slump <br />during construction season. <br />No contact person was available on-site and no records are being currently <br />maintained on site. <br /> <br />