Laserfiche WebLink
<br /> <br /> <br />-3- <br />4. Effect on Permit. In addition, if it is determined that a pattern of <br />violations exists and that the violations were caused by unwarranted failure to <br />comply, or were willful, your permit may be suspended or revoked. <br />SCHEDULE TO NOTICE OF VIOLATION ~ <br />Notice of Violation No. NOV 83-19 <br />1JATURE OF VIOLATION: <br />Failure to salvage and properly store topsoil. <br />Topsoil was used to reinforce the embarkment of the reservoir adjacent <br />to Hubbard Creek. <br /> <br />ACT, REGULATION, OR PERI4IT PROVISION(S) VIOLATED: <br />ACT SECTION(S) <br />REGULATION SECTION(S) 4.06.2 and 4.06.3 <br />PERMIT SECTION(Sj <br />POR7IUN OF THE OPERATION TO WHICH THIS tIOTICE APPLIES: <br /> <br />The reconstructed north embankment of reservoir No. 1, adjacent to <br />Hubbard Creek. <br />STEPS NECESSARY TO ABATE VIOLATION (REhIEDIAL ACTION): <br />1, Remove the topsoil front the reconstructed einbanknient, <br />2. Stare the salvaged topsoil in the topsoil stockpile and stabilize the <br />stockpile by seeding, and <br />3. Reconstruct the embankment of the reservoir with proper materials. <br />