My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27166
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:52 PM
Creation date
11/21/2007 11:32:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Enforcement
Doc Date
5/18/1983
Doc Name
NOTICE OF VIOLATION
Violation No.
CV1983019
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />-3- <br />4. Effect on Permit. In addition, if it is determined that a pattern of <br />violations exists and that the violations were caused by unwarranted failure to <br />comply, or were willful, your permit may be suspended or revoked. <br />SCHEDULE TO NOTICE OF VIOLATION ~ <br />Notice of Violation No. NOV 83-19 <br />1JATURE OF VIOLATION: <br />Failure to salvage and properly store topsoil. <br />Topsoil was used to reinforce the embarkment of the reservoir adjacent <br />to Hubbard Creek. <br /> <br />ACT, REGULATION, OR PERI4IT PROVISION(S) VIOLATED: <br />ACT SECTION(S) <br />REGULATION SECTION(S) 4.06.2 and 4.06.3 <br />PERMIT SECTION(Sj <br />POR7IUN OF THE OPERATION TO WHICH THIS tIOTICE APPLIES: <br /> <br />The reconstructed north embankment of reservoir No. 1, adjacent to <br />Hubbard Creek. <br />STEPS NECESSARY TO ABATE VIOLATION (REhIEDIAL ACTION): <br />1, Remove the topsoil front the reconstructed einbanknient, <br />2. Stare the salvaged topsoil in the topsoil stockpile and stabilize the <br />stockpile by seeding, and <br />3. Reconstruct the embankment of the reservoir with proper materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.