My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-09-20_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2002-09-20_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 11:31:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
9/20/2002
Doc Name
Financial Warranty Increase Operational and General Clarifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MOLYBDENUM COMPANY <br />HENDERSON MINE AND MILL <br />Operational and General Clarifications in Response to Financial Warranty <br />Increase <br />Permit M-77-342 <br />1.0 INTRODUCTION <br />The Henderson Mine and Mill (Henderson) is an active molybdenum mining and <br />milling operation wholly owned and operated by the Climax Molybdenum Company <br />(GMC), which is a wholly owned subsidiary of Pheips Dodge Corporation {PDC). <br />Henderson began underground mining of molybdenite ore and the production of <br />molybdenum disulfide concentrates in mid-1976. The Mining and Reclamation <br />Permit (Permit) required under the Colorado Mined Land Reclamation Act of 1976 <br />(Act} was approved by the Colorado Mined Land Reclamation Board (Board) in late <br />1977. This Permit is M-77-342. Subsequently, the permit was formally amended <br />in 1981 (AM-01) and in 1998 {AM-03) when the rail haulage system was replaced <br />with the present conveyor system. In addition, the Colorado Division of Minerals <br />and Geology (DMG) has approved 10 Technical Revisions (TR) to the Permit over <br />the 24 year operating history of Henderson. One other TR {TR-04) remains under <br />review by DMG, and 7R-12 was submitted to DMG on September 6, 2002. TR-12 <br />involves proposed FW changes for specific areas within the regulatory definition of <br />a TR and is included herein by reference. <br />Historically and operationally, there has been little change in Henderson's <br />operations since production was initiated with the exception of the Henderson <br />2000 change to underground crushing and the mill conveyor system which were <br />subject of AM-03. The mine and mill facilities have been active through the past 24 <br />years with no periods of temporary cessation. Presently, the underground mine is <br />producing at a rate of approximate-y 24,000 Ions per day, 246 days per year; <br />production levels and schedules that are dependent upon market conditions and <br />may vary on short notice. <br />The mine is located at the headwaters of the West Fork of Clear Creek on the East <br />Side of the Continental Divide. Mined ore is crushed underground and conveyed <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.