Laserfiche WebLink
CLIMAX MOLYBDENUM COMPANY <br />HENDERSON MINE AND MILL <br />Operational and General Clarifications in Response to Financial Warranty <br />Increase <br />Permit M-77-342 <br />Table of Contents <br />1,0 INTRODUCTION 1 <br />2.0 NEED FOR CLARIFICATIONS 2 <br />3.0 CLARIFICATIONS 3 <br />3.1 Remova-/Disposal of Chemicals 3 <br />3.1.1 Mine/Underground -DMG #01a 3 <br />3.1.2 Mill -DMG #OSa 4 <br />3.2 Mine Site 6 <br />3.2.1 Pond 2 -DMG #011 6 <br />3.2.2 Wood Chips/Sewage Sludge -DMG #01 p 6 <br />3.3 Remove Exhaust Collar and Seal Vent Shaft -DMG #02a 7 <br />3.4 Surtace Railroad Area -DMG #04a 7 <br />3.4.1 Structural Demolition: PC2 Drive house -DMG #04a 7 <br />3.4.2 Maintenance Fertilize Railroad Area -DMG #04e 7 <br />3.5. Tailings Pond Area -DMG #09 8 <br />3.5.1 Haul Surge Materia- -DMG #09a 8 <br />3.5.2 Place Geogrid on Tailings Pond -DMG #09b 8 <br />3.5.3 Topsoil Tailing Pond -DMG #09d and 09e 9 <br />3.6 Powerline Demolition -DMG #14a 9 <br />3.7 Seepwater Canal i~nd Pumphouse Area -DMG #20 9 <br />3.8 Henderson 2000 Overland Conveyor Components -DMG #24 10 <br />3.8.1 Haul Ore Spilled from Conveyor -DMG #24d 11 <br />3.8.2 Revegetate Conveyor Ciltirridor -DMG #24g 11 <br />3.9 Water Treatment System - pMG #25 11 <br />3.9.1 Mill Water Treatment Facility Construction -DMG #25b 12 <br />3.9.2 Milt Water Treatment Operating Costs -DMG #25c 12 <br />