Laserfiche WebLink
<br />^n~CcIVcD <br />~ n ~. <br />~ ~ ~~'~~ yIVI~IPn of Mmprolp ~ ~ ~ By ~ <br />~f f 14 ~ ~ ~ <br />~, ~ M ~ <br />Division of Minerals S Geology <br />1313 Sherman St. Rm. 215 <br />Denver, Colorado, 80203-2273 <br />Att: Michael Long <br />Ref; Ellison Permit # 78-342 <br />Bond Issue Continuance <br />Dear Mr. Long, <br />iii iiiiiiiiiiiiiiii <br />oe Baldwin <br />641-6500 Rd. <br />ontrose, Colo. 81401 <br />December 5, !997 <br />This is a request to The Board meetingon January 28 S 29, 1998 <br />for a continuance on the bond increase on the Ellison Permit #M- <br />78-342. I need a continuance until Febuary 28, 1998. I need the time <br />to get things worked out with The Dept. of Energy on the bond issue. <br />They are holding a Reclamation Bond als©. <br />The Department of Energy has been in touch with Tom Gillis at the <br />Durango office and has ask him if he could extend a little more <br />time on the bond issue until we get this worked out. <br />I recieved my letter December 3, 1997 stating that the transfer <br />had been rejected by Teluride Mining, Inc. <br />I am also mailing a copy of this letter to Tom Gillis in Durango. <br />Sincerly, <br />r <br />(/ Joe Baldwin. <br />