My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27117
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:50 PM
Creation date
11/21/2007 11:31:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Enforcement
Doc Date
10/18/1994
Doc Name
NOV C-94-030 NORTH THOMPSON CREEK MINE C-81-025
From
DMG
To
MINREC
Violation No.
CV1994030
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman St., Room 215 rd <br /> <br />Denver, Colorado 80203 I <br />~~ <br /> <br />Phone: 13031 866-3 56 7 II <br />FAX: (3071 832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCE <br />October 18, 1994 Ray Romer <br /> Governor <br />Mr <br />Jim Stover Tames S. Lochhead <br />. &ecmive Diector <br />MINREC <br />Michael B. Long <br />2768 Compass Drive D~msion Director <br />Grand Junction, CO 81506 <br />RE: NOV C-94-030 <br />North Thompson Creek Mine (C-81-025) <br />Dear Mr. Stover: <br />Enclosed is a notice of violation for failure to reclaim ponds P-1, 2, and 7 at the North <br />Thompson Creek Mine. The NOV also cites failure to inspect the same ponds, and failure <br />to provide appropriate spillways on Pond P-1. These issues were identified as concerns <br />during the recent oversight inspection of the mine which DMG conducted in conjunction <br />with the Office of Surface Mining. <br />This office previously indicated, in a letter to you dated September 27, 1994, that these <br />matters would be handled as a permit defect. Upon further consideration, the Division has <br />determined that the ponds are not in compliance with regulatory requirements. <br />Consequently, the enclosed NOV was written. <br />Please note that you may submit comments for consideration in assessment of a proposed <br />civil penalty within fifteen days of receipt of the NOV. It would also be beneficial if you <br />notify the Division when on-the-ground reclamation of the structures is complete. <br />Please contact me or Barbara Pavlik of you have any questions. <br />Sincerely, <br />Larry P. Routten <br />Environmental Protection Specialist <br />enclosure <br />cc: barbara Pavlik c:\wp51\101894c <br />
The URL can be used to link to this page
Your browser does not support the video tag.