Laserfiche WebLink
<br />-4- <br /> <br />Additional Board Order Corrective Action Items from hearing of <br />July 22, 1992. <br />1. Maintain the WAD cyanide level below 15 ppm in the active <br />tailings pond, and below 10 ppm in the inactive tailings pond. <br />Status: In compliance with Board Order. <br />2. BMRI shall implement the INCO process as soon as possible, and <br />bring the tailings pond into compliance as soon as possible <br />thereafter. <br />Status: Analyses completed by BMG indicate that the tailings pond <br />sample locations have reached compliance levels. <br />However, the Division has not received independent ],ab or <br />third party analyses since the INCO Cyanide Destruction System <br />became operational. The Division expects to receive the analyses <br />before the January 1993 Board meeting. <br />LDO/ern <br />cc: Ken Kluksdahl, BMG <br />Alana Scott, BMG <br />Dean Massey <br />Maclovio Martinez, Costilla County <br />Ann Baldrige, BMRI <br />Nora Jacquez <br />Helen Sigmund <br />Maria Valdez <br />Roger Flynn <br />Jane I. Kircher <br />M:\oss\ern\m88112 <br />