My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27088
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:49 PM
Creation date
11/21/2007 11:30:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Enforcement
Doc Date
10/16/1995
Doc Name
CARBON JUNCTION MINE PN C-92-080 SETTLEMENT AGREEMENT NOV C-95-020
From
DMG
To
OAKRIDGE ENERGY
Violation No.
CV1995020
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Nawral Resources <br />1311 Sherman 51., Room 215 <br />Denver, Colorzdo 80?07 <br />Phone: (3071 866-3567 <br />FAX: 13011 812~fl 106 <br />SETTLEMENT <br />Cessation Order No. <br />Notice of Violation No. C-95-020 <br />~I~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames S. Lochhwd <br />Eaec olive Direao. <br />Mine: Carbon Junction Permit No. C-92-080 Michael B. Long <br />mislon neclnr <br />Permittee: Oakridge Energy <br />Mailing Address: 278 Sawyer Drive Suite la Durango CO 81301 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: LaPlata Type of Mine: surface private <br />The Division of Minerals and Geology ("The Division") issued a certain <br />Notice of Proposed Amount of Civil Penalty, and the operator requested <br />a conference thereon, as authorized by C.R.S. 1973, 34-33-123(8). <br />The requested conference having been held as required by law, on <br />October 6. 1995 the Division and the operator hereby agree as <br />follows: <br />1. The amount of the penalty shall be $ 1000.00 <br />2. The penalty shall be paid to the Division by the operator not <br />later than 30 days from the date this agreement is signed by <br />all parties; <br />3. Payment of such penalty by the operator shall constitute a <br />waiver of all further rights to review of such penalty or of <br />the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator <br />within ten days after the closing date of such conference, which date <br />is set forth below opposite the signature of the Conference Officer. <br />If not so signed, the Division will keep the penalty paid on September <br />28, 1995 and the operator may request, in writing, a hearing before the <br />Mined Land Reclamation Board. <br />OPERATOR: <br />DATE: <br />By: <br />DIVISION OF MINERALS AND GEOLOGY: <br />DATE: /0) ~ 4f 9J gy <br />Penalty Adjustment Reviewed By <br />IRule 5.04.31411c)I <br />C.R.S. 34-33-1231811c) Id I <br />
The URL can be used to link to this page
Your browser does not support the video tag.