Laserfiche WebLink
H <br />7. SHOP/WAREHOUSE, SOUTH MINE UPPER BENCH. <br />8. SOUTH PORTAL FACILITIES AND SUSPENDED CONVEYOR FROM ABOVE <br />HIGH W ALL <br />9. SUSPENDED CONVEYOR STRUCTURE (EAST SIDE OF RIVER). <br />10. SUSPENDED CONVEYOR STRUCTURE (WEST SIDE OF RIVER). <br />1 L MINEWATER DISCHARGE 002. EAST BANK OF RIVER BETWEEN SUSPENDED <br />CONVEYOR AND CAMEO BRIDGE. <br />12. RECLAIMED NW INTAKE PORTAL (SIPHON DISCHARGE TUBE OUTLET LOCATION). <br />13. RECLAIMED NORTH DECLINE AREA (AND APPROVED LOCATION OF FUTURE <br />GRAVITY DISCHARGE MINE DEWATERING PIPE). <br />14. VIEW AIW UP COAL CANYON. XCEL CAMEO PLANT IN FOREGROUND, ROADSIDE <br />NORTH PORTAL FACILITIES. CRDA-I AND CRDA-2 REFUSE PILES BEYOND. <br />15. CRDA-2 VIEWED FROM CRDA-l. <br />16. TOP OF CRDA-2, WITH CRDA-1 IN BACKGROUND; CRDA-2 UPPER DIVERSION <br />IMMEDIATE FOREGROUND. <br />17. SEGMENT OF COAL CREEK PERMANENT CHANNEL DIVERSION BETWEEN CRDA-t <br />AND CRDA-2. <br />18. NORTH PORTAL FACILITIES EQUIPMENT STORAGE AND COAL HANDLING <br />FACILITIES. <br />19. DECLINE RAMP TO SEALED NORTH MINE PORTALS. <br />20. RAIL LOOP AND LOADOUT TOWER FROM A DISTANCE. <br />21. LOADOUT CLEAN COAL STORAGE PAD AND TRAIN LOADOUT TOWER. <br />22. CONVEYOR TO LOADOUT TOWER. <br />23. TRAIN LOADING TOWER. <br />