My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27011
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:46 PM
Creation date
11/21/2007 11:29:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
8/7/1985
Doc Name
Letter on Permit Revision
From
ANACONDA MINERALS CO
To
OSM
Violation No.
CV1993112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c0 Ooa./ <br />Paonia Ranger District <br />~. P.0. Box 1030 <br />~ United states Forest Paonia Colorado 81428 <br />@ ~ Department of Service w~ nā <br />Agriculture (303) 527-4131 ~ s. ' <br />'. .G, <br />~,` <br />~.~ `i, <br />R¢aYIO. 2820' ~ v <br />~~ <br />Daie August 9;~_1~984 9~ , <br />J~ <br />.,, i.r <br />r <br />Office of Surface Mining <br />Brooks Tower <br />1020 15th Street <br />Denver, CO 80202 <br />L <br />Attn: Floyd Johnson <br />Dear Sir: <br />The West Elk Coal Company has requested to establish a subsidence monitoring <br />network on U.S. Forest Service land in Sections 20 and 21, T.13S., R.90W., <br />6th P. M. <br />The Forest Service requests that the following recommendations and stipulations <br />for the subsidence monitoring network be attached: <br />1. Lop and scatter brush to lie within 2 feet of ground level. <br />2. Maximum of 4" stump height measured from the uphill side. <br />3. Erosion Control - The permittee shall be responsible for the prevention <br />and control of soil erosion and gullying on the area covered by this <br />permit and lands adjacent thereto. <br />4. The proponent will flag the proposed subsidence monitoring net location <br />for approval by the Paonia District Ranger or his representative. <br />5. The proponent shall notify the Paonia District Ranger or his representative <br />within one week of when operations are to commence on National Forest lands. <br />Notification shall also be given as in the preceding paragraph when the <br />project is complete and before rehabilitation equipment is moved off the <br />project area. <br />6. Right-of-way width of the existing roads on National Forest lands will be <br />maintained as they presently exist unless authority to widen is granted <br />by the District Ranger or his representative. <br />7. Trash created by any operation shall be transported to a certified landfill. <br />8. Approved spark arresters will be required on all combustible engines used <br />on the job. <br />9. Operations will not be allowed under muddy or wet conditions. <br />U~-S x <br />~~~ā fa~f <br />
The URL can be used to link to this page
Your browser does not support the video tag.