Laserfiche WebLink
30 Gat Ch. V!1 (7-1-33 Edition) <br />(d) IInderground taming activities <br />shaLL not be conducted beneath or ad- <br />)acent to (1) public buildings and fa- <br />cilities; (2) churches. schools, and Las- <br />pitals, or (3) impoundments with a <br />storage capacity of 20 acre-feet ar <br />sore or bodies of water with a volume <br />of 20 acre-feet or more, unless the sub- <br />sidence control Dlan demonstrates <br />that subsidence will not cause material <br />damage to, or -reduce the reaso»ably <br />foreseeable use of, such teatulrs or fa- <br />cilities. If the regulatory authority de- <br />termines that it is necessary in order <br />t0 minimion the potenttal fOr Irlat¢rial <br />datnsge Lo the features or Ixt7ities de- <br />scribed above or to any aquifer or <br />body of water that serves as a sigtlifi- <br />caht water source tar any public water <br />supply system, it may limit the per- <br />centage of coal extrxted under or ad- <br />Iacentthereto. <br />(e) If subsidence causes tnaterlai <br />damage W any of the features or fa- <br />cilities covered by paragraph (d) of <br />this section, the regulatory authority <br />may SUSpCIId In1213I1g Under OI adjaeeIIt <br />to such features or facilities unto the <br />subsidence control plan is modified to <br />ensure prevention o[ further m~tariat <br />damage to such features or facilities. <br />(I) The regulatory authority shall <br />suspend underground mining activities <br />under urbanized areas, dues, Lawns, <br />and communities, and adlacent to in- <br />dustrial - or commercial., buIIdinga <br />ma;or impoundments, oe perennial <br />streams, if tttrminent danger is found <br />to inhabitants of the n~~~t+nd areas, <br />dries. towns. or communities. <br />(H> Within a schedule approved by <br />Lhe rr vuulatory authority,. the oDeratot <br />shall submit a detalled plan of the un- <br />derground workings. The detaffed play <br />shall include maps and descriptions, as <br />appropriate. of aigaiflcant features Of <br />the underground mine, including the <br />size. pnfiguratian. ~ and approximate <br />location of pillars and entries, extrae- <br />~tion :stios, measure taken to prevent <br />of minimioe subsidence and related <br />damage,. aeeas a[ full esttactlon, and <br />other information required by the reg- <br />ulatory authority, IIDOn request of the . <br />operator, information submitted with <br />the detailed plan tnay be held as cotlfi• <br />iential, is accordabce with the re- <br />luirements of § 773.13(d) of this chap- <br />er. <br /> <br />gorfxs Mining Radamafion and l:aforcamenf, inferior § 3i7-L3^7 <br />(48 FR 39852. June 1. 1983. az amended at 3817.132 Cessation of operations: pew <br />52 FR 4868. F'eb. 17..19871 rtent <br />3817.122 Sabeidenee eontroL• ~Pnblie <br />aoliR <br />At least 8 months prior to mitihtg, or <br />within that period if approved by the <br />regulatory authority, the underground <br />mine operator shall coati a notification <br />to all owners and occupants of surfxe <br />property and structures above the un- <br />derground workings. The notitcation <br />shall include,. at a tninimlrtn. ideatifL <br />cation - of .specific areas )n which <br />m;n;nv will take place, dates that spe- <br />cific areas will be undermined. and the <br />location or locations where the opera- <br />tor's subsidence rnntrol plan may be <br />examined <br />[}8 PR 29652 June 1. 1983] <br />9817.131 Caseation of operations: Tempo- <br />rary. <br /><a) Fach person mho conducts under- <br />ground mining aetivities shall effec- <br />tively support and maintain all sutlxe <br />accei5 openings to underground oper- <br />ations, and secure surface facilities in <br />areas in which there are ao current <br />operations, but operarions are to be re- <br />sumed under an approved permit <br />Temporary abandonment-stall not re- <br />Leve aperson of Lis or her obligarion <br />t0 comply with any Provisions a[ the <br />approved Permit <br />(b) Before temporary cessation of <br />mining and ree!3:=lion operrtiona for <br />a period of thirty days or more, or aS <br />soon as it is known that a temporary <br />cessation will extend beyond 30 days, <br />each person who conducts under <br />ground mining act(vlries shall submit <br />to the regulatory authority a notice of <br />intenticn to cease or abahdon oper- <br />ations This tlottce stall include a <br />statement of the exact number of sur- <br />face acres sad the harizontal and ver- <br />tical extent of sub•surtace strata <br />which Lave been fn the permit area <br />prior to cessation or abandonment, the <br />extent sad kind' Of rPri9m~rion Of sur- <br />face area which will have been accom- <br />plished, sad ldentificarion of rile bac)c- <br />fillln$, regrading, tevegetation. envi- <br />ronmental monitoring. lmderrpotmd <br />opening closures and water treatment <br />activities that w111 continue during the <br />temporary cessation <br />327 <br />(a) The person who conducts under- <br />ground mixing xtlvities shall close or <br />6ackfill Or otherwise permanently re- <br />claim all affected areas, in accordance <br />with this Chapter and according to the <br />permit approved by the regulatory au- <br />thority. <br />(b) All surfxe equipment, struo- <br />lutes, or other facilities not required <br />for continued underground mining as <br />tivities and monitoring, unless ap- <br />proved as suitable for the posttnining <br />land use or environmental monitoring, <br />shall be removed and the a[fected <br />lands reclaimed. <br />§ 817.17.7 Pmtmining land ase <br />(a) General All disturbed areas shall <br />be restored in a timely manner Lo con- <br />ditions that are capable of suDDOrf <br />ing- <br />(1) The uses they were capable of <br />supportlnB before any mining; or <br />(2) Higher or better uses. <br />(b) DeternLinin9 premininD was of <br />fared: The Premining uses of land to <br />which the Do~r^+intno land use is com- <br />pared shall 6e those uses which the <br />land previously supported, it the land <br />has not been previously maned and has <br />been properly tira-iaged. The Dostmin- <br />in6 land use for ]and that has been <br />previously mined and not reclaimed <br />shall be fudged on the basis of the <br />]and use that existed prior to nay <br />mining-. provided Heal u the ]and <br />Cannot be reclaimed to the Land use <br />that existed prior Co any minin6 be- <br />cause of the previously mined condi- <br />tion, the postmtning ]and use stall be <br />judged on the basis of the highest and <br />best use that can be achieved which is <br />compatible with surrounding areas <br />and does not require the disturbance <br />o[- areas Drevtously unaffected by <br />ruining. ~. <br />(c) Criteria for alternatiae postmin- <br />in9 Land ores Hither or better uses <br />may be approved by the regulatory au- <br />thority as alternative pn<tm;ning land <br />uses after wt7sultatfon with the land- <br />owner or Lhe ]and management agency <br />having jurisdiction over the lands, tt <br />the proposed uses meet the following <br />criteria: <br />