My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26948
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:44 PM
Creation date
11/21/2007 11:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979010
IBM Index Class Name
Enforcement
Doc Date
9/17/1998
Doc Name
REASON TO BELIEVE LETTER AVERY PIT M-79-010
From
DMG
To
AVERY STRUCTURES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! • <br />CIVIL PENALTY (C. R.S. 34-32.5-I23(2) and (4) bIINING WITHOUT A PERiVIIT (To be completed <br />by staJ~ <br />1. Require the operator and/or landowner to pay a minimum civil penalty in [he amount of .4733 00 , <br />based on 22 hours of staff time at 333301hour. <br />2. If the Board finds the operation to be an illegal Construction Material Ex[raction Operation. [he Board <br />should also assess the operator and/or landowner a civil penalty of not less [han 31.000.00 per day nor <br />more than 35,000.00 per day for each day the land has been affected, not to exceed 365 days. <br />[n this case, the Office recommends that the Board could find 42 days <br />of violation at 3 L000.00 per day. <br />3. The total civil penalty of 3 42.733.00 (Nos. 1 & 2(a)) is due 30 days from the date of the signed Board <br />Order. <br />CIVIL PENALTY (C.R.S. 34-32.5-123(2) and (4)) EXPLORING WITH OUT A PER1bIIT (To be <br />completed by the staffl <br />4. If the Board fmds the operation to be an illegal Construction Material Exploration Operation, the Board <br />should also assess the operator andlorlandowner a civil penalty of not less than $50.00 per day nor more <br />than $200.00 per day for each day the land has been affected, no to exceed 60 days. <br />In this case the Office recommends that the Board fmd days of <br />violation at $ per day. <br />5. The total civil penalty of $ (Nos. 1 & 4) is due 30 days from the date of the signed Board <br />Order. <br />SUSPENSION OF CIVIL PENALTIES <br />The Board may suspend all or a portion of the civil penalty to encourage timely compliance with the corrective actions, <br />and compliance with the Act and Rules and Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.