My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17779
DRMS
>
Back File Migration
>
Revision
>
REV17779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:29:30 AM
Creation date
11/21/2007 11:28:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/6/2005
Doc Name
Letter, Application and Public Notice
From
J.E. Stover & Associates Inc
To
DMG
Type & Sequence
TR39
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. J. Dudash - 2 - April 5, 2005 <br />7. Since the mine discharge water from pond C was routed through culvert C- <br />G2, anew culvert C-G2 was installed and is dedicated to handle only the flow <br />from the gob pile haul road, ditch D-G1. <br />The topsoil salvaged from the drill pad above the utility bench was to be <br />stockpiled on top of the B-Seam excess material storage stockpile. However, <br />ground conditions did not allow the topsoil to be place8 in that location. I <br />would like to leave the topsoil stockpile shown on the B-Seam excess <br />material storage stockpile to allow flexibility for any future topsoil salvable <br />operations. <br />9. Map 21-1 was amended to show the revisions to the drainage plan that <br />resulted from culvert C-C8 being abandoned. Culvert C-C8 is now the culvert <br />that handles a small amount of drainage originating from the B-Seam portal <br />bench. There are two culverts that run under the paved haul road at the <br />entrance to the B-Seam portal bench. One is culvert C-C8, the other is to <br />handle discharge from the mine and is not a design culvert. <br />10. My version of Map 15-2, revision 16, shows a topsoil stockpile located on the <br />west slope of the rock protection berm. Is this the topsoil stockpile you are <br />concerned about? <br />11. New culvert C-C21 was added to the north side of the paved road leading to <br />the office parking lot. Ditch D-C20 flows to C-C21. <br />Amended pages 2.05-16, 2.05-29, Exh8-29, 29i, 31, 32v, 58iii, 66, 67, 69, 72, 74 and <br />Maps 15-1, 15-2, 21-1, 21-2 and 22-C are enclosed. <br />Please call if you have any questions. <br />Sincerer <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.