Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources ~~oe~co~~ <br />N` <br />1313 Sherman 51., Room 115 <br />Denver, CO 80203 •• ` <br />•re 16• <br />Phone: (3031866-3567 <br />FA%: (303) 832-8106 <br />Roy Romer <br />MINING PERMIT - COAL c°"er"°` <br />TECHNICAL REVISION DECISION FORM M"n,eis.`°"S <br />Division Dirttlor <br />The Division of Minerals and Geology, Department of Natural Resources, State <br />of Colorado has proposed the decision stated below. The decision will become <br />effective upon the termination of the ten <10) day public comment period, <br />pursuant to Rule 2.08.4(5)(b)(ii). <br />Permit No.: C-81-025 <br />Submittal Date: October 07, 1992 <br />Revision Decision Type: Approved <br />Minel: No Thompson Ck Mine <br />Permittee: MINREC, Inc. <br />Technical Revision No.: 014 <br />Decision Date: December 21, 1992 <br />Description of Revision: Revise Vegetation Success Reference Area and Erosion <br />Control Plan <br />Change in Bond Amount (+/-) ) $ <br />Area Changes <br />Disturbed Area (+/-) .0 Ac. Max. Disturbed Area (+/-) .0 Ac. <br />Affected Area (+/-) .0 Ac. Permit Area (+/-) .0 Ac. <br />Federal Land (+/-) Ac. State Land (+/-) Ac. Private Land (+/-) Ac. <br />Revised Application Pages4-18, 4-19, 4-19i-iii, 4-64. 4-65, 4-66 and <br />Appendix 3-W Revised Maps Vegetation Monitoring (See Appendix 3_-W) <br />PERMITTEE2 DIVISION OF MINERALS AND GEOLOGY <br />COLORADO DEPAR..T~~M~ELLNffT~~O~~F NATURAL RESOURCES <br />Authorized Representative Authori ed e~esentat <br />DATE: DATE:~(/.,P,~_.C~ I/~'/(Z <br />--r . <br />Stipulations Attached Yes No X <br />lIf this action pertains to a federal mine (coal or surface ownership) the <br />permittee must send copies of the approved technical revision to the agencies <br />listed on the Federal Agency Mailing List. for non-Federal mines 1 copy of <br />the revision must be sent certified mail to OSM at Suite 1200, 505 Marquette, <br />NW, Albuquerque, New Mexico 87102. The project may not proceed until all <br />copies have been sent. <br />2Signature is required if stipulations are attached. <br />0927G <br />