Laserfiche WebLink
Page 1 of 1 <br />Dudash,Joe <br />From: Jim Stover [estover@bresnan.net] <br />Sent: Thursday, November 13, 2003 1:02 PM <br />To: Joe Dudash <br />Subject: TR-30 Gob Pile <br />Joe: <br />Since there is a new sediment pond for the gob pile, the following complicating issues arise: <br />1. Section 7 consultation for the additional depletion (evaporative loss discussed in Section 2.04.11). <br />2. Working with Craig Lis to obtain approval of a substitute water supply plan. I submitted an application for a <br />SSP to the State Engineer November 5th. <br />I think you should initiate the Section 7 consultation as soon as possible. <br />Jim Stover <br />12/8/2003 <br />