My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17636
DRMS
>
Back File Migration
>
Revision
>
REV17636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:29:19 AM
Creation date
11/21/2007 11:26:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Revision
Doc Date
3/22/2001
Doc Name
BULLDOZER WORK
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. ~ . ` III IIIIIIIIIIIII III <br />CIRCES Cost Estimating oftware <br />BULLDOZER WORK <br />Task q : 001 <br />Date : 03/22/2001 <br />User : LDO <br />Agency or organization name :OMG <br />PermiT or other job action :Bond Increase due to TR-1 <br />task description :Spread staging area pad materials on lake bank slope <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 13,900 <br />State :Colorado <br />County :Otero <br />Site :North River Pit <br />Basic machine :Cat D8R - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Utilization <br />Ownership cosUhour : $43.30 NA <br />OperatingcosUhour : $66.26 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $2799 NA <br />Total unit cosVhour : $13756 Total fleet cosUhour <br />3137.56 <br />Swell Loose <br />CCY factor : 1.125 volume : 15,638 LCY <br />Source of estimated volume : TR-1 and /nspection Report <br />Source of estimated swell factor :cat hndbk <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Compacted /ill or embankment <br />150 feet <br />685.7 LCY/hr <br />Average push gradient <br />Average site altitude <br />Material weighT <br />Weight description <br />Earth -Dry packed <br />1.00 45 (i <br />4,035 feet <br />2,550 Ibs/LCY <br />,t08 TIME AND COST <br />Fleet size : 7 Dozer(sJ <br />Unit cost : $0.555 /LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 0.90 (Cat HB <br />Dozing method : >.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (fshilUda <br />~ Spoil pile : 0.70 (/nd-m/, <br />Push gradient : i.02 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Material weight : 0.90 (Cat HB <br />Blade type : 7.00 (S/SU/L <br />Net correction : 0.36 <br />Adjusted unit production : 247.98 LCY/hr <br />Adjusted fleet production : 247.98 LCY/hr <br />Total job time : 63.06 Hours <br />Total job cost : $8,674 <br />PermiUjobtk : M-1999-005 <br />Abbreviation :none <br />Filename : M005-001 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.