My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26844
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:39 PM
Creation date
11/21/2007 11:26:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Enforcement
Doc Date
3/5/1990
Doc Name
NOV C-90-008 CYPRUS ORCHARD VALLEY COAL CORP PN C-81-038
From
CYPRUS ORCHARD VALLEY MINE
To
MLRD
Violation No.
CV1990008
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIIIIIIIIIIIII <br />999 <br />7i5n <br />c~~us <br />Orchard Valley <br />Cyprus Orchard Valley Mine <br />P. O. Box 1299 <br />Paonia, CO 87428 <br />Phone: 303-527-4135 <br />Fax: 30&527-2234 <br />b1AR 5199 <br />February 28, 1990 <br />Mr. Jeff Clapton <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, CO 80203 <br />RE: NOV. #C-90-008 <br />CYPRUS ORCHARD VALLEY COAL CORP: PERMIT #C-81-038 <br />Dear Mr. Clapton: <br />Cyprus Orchard Valley Coal Corporation (COVCC) requests that <br />Colorado Mined Land Reclamation Division (CMLRD) vacate the above <br />referenced NOV. COVCC does believe that it has failed to implement <br />repair of the west portal cut failure in accordance with approved <br />Minor Revision 62. In fact, COVCC has initiated repair in accor- <br />ance with MR62, as noted in CMLRD`s past three inspections and in <br />COVCC's progress report to CMLRD, dated February 7, 1990. However, <br />work at this site has not been completed. No deadline for comple- <br />tion of the work was identified in MR62 or required by CMLRD. <br />COVCC has proceded in good faith and kept CMLRD informed of it's <br />progress. As noted in the COVCC progress report of February 7, <br />1990, initial work on the site has been completed. Subsequently, <br />and prior to final completion of the work, COVCC contracted with <br />Mr. Michal Bukovansky of CH2M Hill (who designed the repair ac- <br />cepted by CMLRD in MR62) to evaluate the initial work. His evalua- <br />tion shows that the existing cut configuration is only slightly <br />steeper than that recommended. Furthermore, he has specifically <br />recommended that further excavations or cut modifications be <br />delayed until after the 1990 spring and summer season. This will <br />allow for the necessary time to evaluate the stability of the <br />current slopes. Any additional modification at this time does not <br />assure any greater stability. A copy of his report of <br />investigation and observations is attached. <br />MINED LAf~O <br />RECLgA/ATIRN DIVISION <br />
The URL can be used to link to this page
Your browser does not support the video tag.