Laserfiche WebLink
3(13-279-3.532 <br />3(13-279-16(19 ~a~ <br />cccusc.~r~a'att.nct <br />.Tune 11.2007 <br />A-Ir. Timm Comer <br />Anglugold Curp. <br />P.O. 13ox 191 <br />100 \urth 7~hird Street <br />V"ictor. Colorado 80860 <br />Re: Demolition Cost Estimate for I:n~,intcring Ruildine <br />Dear Timm: <br />AUached please find a cost estintatc for demolitiun of the lingineerin~ Building at <br />CCK V. Thz assumptions. inputs, ca{culation. and sununar~" arc shown im the atizichcd <br />spreadsheet. fused the latest (3007) A~lrtns } leave C'onsh-uctiun Cost Data inl~~rnrllion <br />available in my calculation. The range of costs fur demolitiun is $27.579 (bare cost) to <br />$36.364 (includes overhead and profit). If ti~ou use CCKV equipment to perform This <br />work. i[ nti~>>t be slightly less dot to the litct ~~ou bare no mobili~uiun to the site and <br />your equipment is larger than standard demolition machinery. On the other hand. <br />contractors experienced in demolition tvpir<tlly bare specialized equipment (i.e. shears <br />and wrecking balls) that are more soiled to "demo" work. <br />IC you have any questions. please call me. I will be in m~' otlice ~~'cdncsda~ through <br />Pridaq, .tune 13- I ~ and ~l'cdntsd;~y through Pridav. lone 20-33. <br />Sincerely. <br />~LSc~.~ f l~ C ~~Y <br />Michael D. lillis, P.E. <br />Attachments: Engineer's Estimate for llemulition of CC'fi~%'s Engineering 8uildini <br />Ellis En~~ironmcntal F.nginecring, Inc. <br />4342 Ulysses Way <br />C,oldcn, Colorado 30x03 <br />