My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-29_ENFORCEMENT - C1981010
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981010
>
2003-08-29_ENFORCEMENT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2020 3:30:23 PM
Creation date
11/21/2007 11:26:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Enforcement
Doc Date
8/29/2003
Doc Name
Paid Civil Penalty
From
Trapper Mining Inc
To
DMG
Violation No.
CV2003004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pF'~ <br />~~ • <br />~" R8 <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />~~31~~3 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-2003-004 <br />MINE: Trapper Mine <br />PERMITNO.: C-1981-010 <br />OPERATOR/PERMITTEE: <br />Trapper Mining Inc. <br />ATTENTION: Forrest V. Luke <br />ADDRESS: P.O. Box 187 <br />Craig, CO 81626 <br />DATE ISSUED: June 5, 2003 <br />TYPE OF MINE: Surface/Federal <br />COUNTY: Moffat <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on July 29, 2003, the Division and the operator hereby <br />agree as follows: <br />The amount of the penalty shall be $950.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: T~ //~ M'~'^' ~''`-• DATE: 8~1~%-5 <br />By t/' <br />DNISION OF ,pINERA~LS AND GEOLOGY: <br />By ~/~ - ,tom DATE: ~ ~ ~ t7 <br />Conference Officer <br />By <br />Division Director <br />Penalty Adjustment Reviewed <br />[Rule 5.(M.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d) <br />GNV.Of_C19NI010 JHB 10030815 3003~PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.