Laserfiche WebLink
• <br /> <br />the Mined Land Reclamation Division no later than Dec <br />1991. The remaining provisions of the April Order r~ <br />force and effect. <br />PERMIT MODIFICATION <br />Since the Board has increased the amount of the <br />warranty, and since the operators have provided proo <br />increased financial warranty, several provisions of <br />M-84-036 are no longer warranted. Accordingly, Perm. <br />should be modified to reflect the current conditions <br />and the $152,250.00 financial warranty. Pursuant to <br />sions of §34-32-124(6), Permit M-84-036 is hereby mo< <br />follows: <br />per 13, <br />in in full <br />financial <br />of such <br />Fermi t <br />t M-84-036/ <br />at the site <br />the provi- <br />if led as <br />5. The provisions requiring continuous reclam tion of the <br />site and limiting the area of unreclaimed disturbanc at any one <br />time to 11.5 acres, and the provisions requiring the redistribu- <br />tion of topsoil within 60 days of removal, ate 'neteb deleted. <br />6. The sides of the pit shall be graded in co p'.i.ance with <br />Rule 6.1(6), 2 CCR 407-1, and the pit shall be kept ry until <br />such grading has been completed. <br />7. All existing topsoil stockpiles shall be s abilized and <br />revegetated within two weeks of the end of snowmelt n the spring <br />of 1992. <br />8. All subsequently created topsoil stockpile shall be <br />stabilized and revegetated as soon as practicable du ing the <br />first available growing season. Such glowing season shall be <br />defined as the end of snowmelt in the spring until J ne 1, and <br />during the months of September and October. <br />ChairmanV .+Lyyv, <br />Mined Land Reclamation <br />AG Alpha No. NRLRICAC$ <br />AG File No. E9116915.2! <br />-2- <br />