Laserfiche WebLink
NOTICE <br />Aggregate base course depth for haul road construction has been changed from 14 <br />inches to 10 inches. This design change includes all haul roads excluding <br />poRions where geogrid will be placed. Drawing 501-603, Summary of <br />Construction Quantities, should be changed as follows: <br />North Ramp, Item 3 - 1758 CY <br />North Haul Road, Item 3 - 2320 CY <br />Interceptor Road to Topsoil Pile A, Item 3 - 1481 CY <br />Phase II -Future Construction of Haul Road, Item 3 - 3570 CY <br />South Ramp, Item 3 - 1100 CY <br />South Haul Road, Item 3 - 1012 CY <br />Total Aggregate Based on 10-inch thickness - 11241 CY <br />Drawing 501-602, Detail 6 (Table), should be changed to read: Thickness "Tg" _ <br />10" <br />With an allowance for additional aggregate and including the overproduction of <br />material for future Henderson use, the total volume of Class 5 aggregate to be <br />produced for this bid has been changed to 15,000 cubic yards. <br />