Laserfiche WebLink
Rec]amation Table Continued. <br /> Unit Cost Cost <br />As ect Reclamation O eration uanti Units $ ($ <br />E. Roads and Conveyors <br /> 1. Demolition and removal of Bo nded und er Permit M20 01008 <br /> Conveyor Bridge <br /> 2. Scarify compacted ground 1.0 Ac 25 25 <br /> 3. Replace topsoil, 6" x 1.0 acres S00 CY 1.25 1,000 <br /> 4. Seed and mulch 1.0 Ac 800 800 <br /> 5. Reseed 20% 0.2 Ac 800 160 <br />F. Plant Site, Office, and Scale House <br /> 1. Scarify compacted ground 18 Ac 25 450 <br /> 2. Replace topsoil, 6" x 18 acres 14,520 CY 1.25 18,150 <br /> 3. Seed and mulch 18 Ac 800 14,400 <br /> 4. Reseed 20% 3.6 Ac 800 2,880 <br />Total Disturbance Costs 246,095 <br />Contractor Mobilization/Demobilization (8%) 0.08 19,688 <br />Overhead (18.5%) 0.185 45,528 <br />Administration (5% 0.05 12,305 <br />Total Pro osed Financial Warran 323,616 <br />Disturbed Acreage 52.5 <br />Financial Warranty er Acre 6,164 <br />Pfatte Palley Operation <br />DMG 112 Permit Amendment <br />Page 24 <br />