Laserfiche WebLink
Task 016 <br />1. No further comment <br />Task 017 <br />1. No further comment <br />Task 018 <br />1. No further comment <br />Task 019 <br />1. No further comment <br />Task 020 <br />1. No further comment <br />Task 021 <br />1. No further comment <br />Task 022 <br />1. Electric powerlines along Morgan and BB Detour Road are underground lines, <br />not overheads. Your bond calculations appear to be figured on removal of <br />overhead lines and poles. The current temporary power lines are buried at a <br />minimum of 40 inches (farming plow depth is a nominal 30 inches) per San <br />Miguel Power rules or regulations. San Miguel will abandon the line when no <br />longer in use. <br />2. Cost should be zeroed out. <br />Task 023 <br />1. No further comment <br />Task 024 <br />1. No further comment <br />Task 025 <br />1. This task has been complete. Confirm with Mike Boulay and his March <br />07 Mine Inspection <br />2. Apply for bond release will follow shortly and a letter of completion from <br />the Colorado Cooperative Company will be pursued. <br />Task 026 <br />F:\Eng\DATA\WPYevisions\TR54.wpd Page 5 of 15 <br />