Laserfiche WebLink
1. Please see Map 3.02.2-7, and especially the average end volume <br />summary chart on Map 3.02.2-8 for volumetrics and haul distances to <br />reclaim BB Detour Road from Station 0+00 to 33+00. Map 3.02.2-9 <br />shows the volumetric calculations for the out of BB Road stockpiles. <br />2. 7535LCY of fill is needed. <br />3. 1810LCY of cut from the roadway can be used to offset the 7535LCY <br />figure <br />4. 1996LCY of fill will be hauled from the stockpile across from station <br />38+00 to wherever it is needed. <br />5. The remaining 3805LCY can be borrowed from a stockpile near station <br />17+00 to finish up the job. <br />6. A good one way haul distance of 1644ft can be used. This distance is <br />the distance from the stockpile nearstation 38+00 to the centroid at <br />16+50. <br />Task 084 <br />1. No further comment <br />Task 085 <br />1. No further comment <br />Task 086 <br />1. No further comment <br />Task 087 <br />1. No further comment <br />ask 088 <br />1. No further comment <br />Task 089 <br />1. No further comment <br />Task 090 <br />1. No further comment: <br />Task 091 <br />1. No further comment: <br />Task 092 <br />F:\Enq\DATA\WPVevisions\TR54.wpd Page 15 of 15 <br />