Laserfiche WebLink
1. New acreage of 12.25 acres at 27inch have been calculated as can be <br />seen on Map 3.02.2-6A. <br />2. There will be zero acres requested for Phase 2 release at this time so go <br />ahead and include the cost in TR54. <br />3. There is a topsoil stockpile 1350 feet to the south of Task 046 that is <br />shown on Map 3.02.2-6A.. A shorter haul distance than what you have <br />listed. Please recalculate. <br />Task 047 <br />1. New acreage of 4.50 acres at 27inch have been calculated as can be <br />seen on Map 3.02.2~A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55 <br />Task 048 <br />1. New acreage of 47.32acres at 22inch have been calculated as can be <br />seen on Map 3.02.2~A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55 <br />Task 049 <br />1. New acreage of 26.93 acres at 22inch have been calculated as can be <br />seen on Map 3.02.2-6A. <br />2. There will be zero acres requested for Phase 2 release at this time so go <br />ahead and include the cost in <br />3. Be sure to revise the struck and heap volume of 24 & 34 LCY for a 631 <br />scraper <br />Task 050 <br />1. New acreage of 6.69 acres at 22inch have been calculated as can be <br />seen on Map 3.02.2-6A. <br />2. There will be zero acres requested for Phase 2 release at this time so go <br />ahead and include the cost in <br />3. Be sure to revise the struck and heap volume of 24 & 34 LCY fora 631 <br />scraper.. <br />F:\Eng\DATA\WP\revisions\TR54.wpd Page 10 of 15 <br />