Laserfiche WebLink
- STATE COF COLORADO <br />DIVt510N OF MINERALS AND GEOLOGY <br /> <br />Department o(Nmural ResourCeS V <br />1313 Sherman Sr., Room 21 S <br />D I v t 5 1 o N <br />Denver, Colorado 80203 <br />Phone: 17031.866-3567 M 1~ iv F R~ <br />fAX: (303) 832.8106 &-- <br /> GEOLO <br /> 0.EC LAMAT <br /> PERFORMANCE WARRANTY MININC•sAF <br /> Bill Owem <br /> Governor <br /> ' Greg E. Walther <br /> Executive Dlrecwr <br /> // // n~g <br />~ Michael B. long <br />Operator: ~ 6'l t , ~ ~/1'l <br />A7.~ ~-l. Division Director <br />Operation: - __. <br />Permit No: /'l~ !~~`1 '~~~ <br />KNOW ALL MEN BY THESE PRESENTS, THAT: <br />WHEREAS, the Colorado Mined Land Reclamation Act, C.RS. 34-32-101 et seg. (the "Act"), as <br />amended, and the Colorado Land Reclamation Act for the Extraction of Construction Materials, <br />C.R S. 34-32.5-101 gt ~gq: (the "Act"), as amended, provides that no permit maybe issued under the Act <br />until the Mined Land Reclamation Boazd (the "Board") receives a performance warranty (or warranties) that <br />is a written promise to comply with all applicable requirements of the Act. <br />WHEREAS, (//1G?iYL~.~A~.yhhli'i°`~ LLt'. (the "Operator"), has applied for <br />a permit to conduct a mining open u n latown as <br />(the "Operation") on certain lands in ~ L~ County, Colorado. These <br />lands are described in the permit application, as amended and supplemented, and are referred to herein as <br />the "Affected Lands". <br />WHEREAS, in its application for the permit, the Operator has agreed to be bound by all <br />requirements of the Act and a31 applicable rules and regulations of the Boazd, as amended from time to time. <br />WHEREAS, the Boazd has determined, in accordance with the Act, that the estimated costs of <br />reclamation with regard to those affected lands in ~>lQll County which are now or may <br />become subject to the permit are those amounts for the stated periods of time as set forth in the financial <br />warranty, which may be amended from time to time to reflect revised estimates of said costs of reclamation. <br />WI~REAS, the Operator hereby gives the Board a performance warranty pursuant to . <br />Section 34-32-117(2) or Section 34-32.5-117(2) of the Act, and herein promises the Board that it will <br />comply with all applicable requirements of the Act with regard to those Affected Lands. <br />