Laserfiche WebLink
<br /> <br />EXHIBIT L-RECLAMATION COSTS <br />The reclamation cost estimate is being calculated on <br />basis. Once the maximum disturbed acreage is determine <br />bond amount will be determined. This will depend on th <br />acres in various states of disturbance. For exampl <br />developed pit will require backfilling and grading plus <br />plus revegetation, whereas some of the regraded areas <br />require topsoiling and revegetation. If some areas ar <br />fully reclaimed and awaiting warranty release, the Di' <br />only hold revegetation costs for those areas. So, a <br />cost for these various stages will be calculated a; <br />receive your responses determining how many acres will b <br />for each stage, a final reclamation bond will be propo <br />i per acre <br />.the final <br />number of <br />a fully <br />topsoiling <br />could only <br />basically <br />ision will <br />eclamation <br />3 once we <br />disturbed <br />EXHIBIT M-OTHER LICENSES AND PERMITS <br />Has the Water Quality Control Commission been co tacted to <br />determine if a stormwater permit is required? If not, please do <br />so. <br />EXHIBIT N-SOURCE OF LEGAL RIGHT-TO-ENTER <br />No Comment <br />No Comment <br />EXHIBIT P-MUNICIPALITIES WITHIN TWO MILES <br />No Comment <br />No Comment <br />EXHIBIT R-PROOF OF FILING WITH COUNTY CLERR <br />No Comment <br />EXHIBIT S-PERMANENT MAN-MADE STRUCTURES <br />No Comment <br />