Laserfiche WebLink
RECLAMATION PLAN (CONT) <br />AMRID® APRIL 4OOY <br />Amendment # 8 - REVISED RECLAMATION TIMETABLE <br />ESTIMATED RECLAMATION TIMETABLE <br />(Amended April 2002) <br />ExN181T E <br /> ACRES ± <br />Phase Years* Total Revegetation Roads, Ind., <br />Comm, & rip <br />rap Undis- <br />turbed <br />I 3-5 260.08 170.42 76.56 13.10 <br />S Complete 20.75 0.00 0.00 20.75 <br />W complete 3.00 0.00 0.00 3.00 <br />g complete 4.28 0.00 1.56 2.72 <br />Y 3-5 1.30 0.00 1.30 0.00 <br />Z complete 2.66 0.00 1.75 0.91 <br />TOTAL 292.07 170.42 81.17 40.48 <br />* The numbers in this column refer to how long it will take to reclaim the area when mining <br />ends. Since reclamation rune concurrent with mining only the last area mined will need to be <br />reclaimed, not the entire area of the Phase. <br />20 (Revised 8/19/02) <br />