Laserfiche WebLink
• III IIIIIIIIIIIIIIII l • Sunshine Items <br />AGENDA ITEM tE 9, 10, and 11 <br />INFOR?CATION OTi: <br />HART ROK REDI-MIX CONCRETE, INC. <br />TRANSFER OF PERMITS AND SUCCESSIONS OF OPERATOR FOR THREE GAA VEL PERMITS <br />TO HARD ROCK PAVING AND REDI-MIX, INC. <br />FOR GROUP PRESENTATION: <br />T0: r[ined Land Reclamation Soard <br />FROPt: Mark S. Lope <br />DATE: April 22, 1982 <br />Following is a brief summary of the contents of an application to be <br />considered for group presentation. The information is accurate as <br />of the above date. <br />Operator Hart Rok Redi-Mix Concrete, Inc. <br />File Nos. 77-795. 77-795 & 77-197 <br />Operation Type Open pit 4ravel (all limited impact permits) <br />General Location 77-195: b.0 acres, about 1 mile NW of Salida; <br />77-196: 9.5 acres, about 1.5 miles N of Buena Vista; 77-197: 9.8 acres, <br />Acres about 1 mile S of Salida; all in Chaffee County <br />Mining Plan This is a request for transfer of permit and succession of <br />operator to Hard Rock Pa vi n4 and Redi-Mix, Inc. for all three of these. <br />limited impact permits. Staff also recommends an increase in bond of from <br />the existing 52,500.00 on each operation to 55,000.00 on each operation. <br />Reclamation Plan: <br />Final land use <br />Slope grading <br />Topsoil depth <br />Species to be <br />planted <br />Additional Details Considerin4 current reclamation costs and the increase <br />in ma ximum_financial warranty to $5,000.00 for limited impact operations, <br />the stafF feels that the increases in financial warranty are justified. The <br />new operator has agreed to the bond increases and plans to submit corporate <br />General Timetable sureties to replace the existing certificate of <br />deposit. <br />Staff Recommendation Staff recommends the aF <br />operator and that the financial warranties all <br />royal of the successions of <br />increases to <br />