My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26681
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26681
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:32 PM
Creation date
11/21/2007 11:22:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
7/29/1998
Doc Name
NOV
Violation No.
CV1998006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~_ <br />IMPORTAR'T: Please i <br />expressly or in pr <br />upon you, unless. <br />the site, or (b) the <br />over by represents <br />relief from the or <br />affected by any w <br />carefully. <br />F Notice -Informal Hearing at Site. If this notice requires cessation of mining, <br />ctical effect (but not otherwise), it will expire automatically 30 days after service <br />vithin [hat time, (a) an informal hearing on the cessation has been held at or near <br />operator has waived the holding of such a hearing. The hearing will be presided <br />fives of the Division other than the representative who issued the order. Temporary <br />ter may not be requested at such hearing. Your right to a formal review is not <br />fiver on your par[ of an informal hearing. <br />2. Formal Review sold Temporary Relief. The operator has the legal right to a review of this notice of <br />violation in a publ'c hearing before the Colorado Mined Land Reclamation Board. You may apply <br />for review by sub tong a request for review within 90 days of the issuance of this order. The request <br />for review must b submitted to: Colorado Mined Land Reclamation Board, 1313 Sherman Street, <br />Room 215, Denve ,Colorado 80203. <br />If you request a f~Otmal hearing, you may request temporary relief from this notice of violation, <br />pending hearing, b t the filing of a request for review does not operate as a stay of any order or notice. <br />Procedures in [his resard are found in C.R.S. 1973, 34-33-124. <br />3. Penalties. If you fail to correct any of the violations described in this notice within the period <br />permitted for its c rrecting, a minimum penalty of $750.00 or more mast be assessed for each day <br />during which the violation(s) continues beyond the abatement period set forth in this notice. <br />If you willfully a{td knowingly fail or refuse to comply with a condition of a permit, you will be <br />subject to crimin prosecution and will. upon conviction, be punished by a fine of not more than <br />$10.000.00 or by gmprisonment for no[ more than one year, or both. <br />In accordance wi~h Section 5.04.3(1) of the Rules and Regulations of the Colorado Mined Land <br />Reclamation Bo rd for Coal Mining, within 15 days of service of a notice of violation or <br />cessation order, ou may submit written information about the violation to the Division. The <br />Division shall co Sider any information so submitted in determining the facts surrounding the <br />violation and the amount of civil penalty to be proposed under Section 5.04.3(2). <br />4 <br />violations were <br />suspended or re <br />In addition, if it is detet~rtined that a pattern of violations exists and that the <br />tsed by unwarranted failure to comply, or were willful, your permit my be <br />0221F(3/97) <br />
The URL can be used to link to this page
Your browser does not support the video tag.