Doc Date
8/4/2006
Doc Name
3rd Adequacy Review Letter
From
DMG
To
J.E. Stover & Associates Inc
Type & Sequence
TR47
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
However, backfilling and grading operations at the East Mine still would not begin until 2008 <br />according to this revised reclamation schedule. Also, for the unit train loadout, there is no year <br />associated with several of the reclamation operations, only reference to note 1. This note basically <br />states that reclamation is open-ended while the Union Pacific uses the tracks. In this senario, <br />however, BRL would be delaying reclamation of the unit train loadout for a use that does not <br />apply directly to the Bowie No. I Mine. <br />The Division appreciates BRL's efforts at reclaiming the structures at the unit train loadout this <br />year. However, the Division requests that BRL revise Figure 2.05.5 to reflect that backfilling and <br />grading operations at the East Mine and the unit train loadout will begin in 2007 and will be <br />finished within one year. Concerning the unit train loadout, BRL does have the option of <br />requesting a postmining land use change with the appropriate demonstrations required in Rule <br />4.16.3. <br />The Division also requests that Figure 2.05-5 be updated to include the current reclamation work <br />at the East and West Mines. As documented in the Division's field inspection report of July 26, <br />2006, this work includes water tank removal at the East and West Mines as well as power line and <br />power pole removal and concrete demolition at the East Mine. <br />3. The Division requests that the scheduled time allocated for the remaining reclamation activities <br />shown in Figure 2.05-5 be shortened where feasible or provide an explanation as to why the <br />stated length of time allocated for these reclamation tasks is necessary. <br />[n the submittal dated July 26, 2006, BRL did not shorten the length of time allocated for any of <br />the remaining reclamation tasks, nor did BRL explain why no such adjustments were made. As <br />also requested in item number 2 above, please condense the time frames for the various <br />reclamation tasks listed in Figure 2.05-5 so that reclamation can be completed within one year. <br />4. The recommendation of the Applicant violator System (AVS) is to "issue ". <br />5. Please inform the Division in writing whether or not the reclamation cost estimate that was sent to <br />BRL in a letter dated November 4, 2005 is acceptable to BRL. <br />This issue is still active. <br />If you have any questions, please call me. <br />Sincerely, <br />r~ D <br />seph J. Dddash <br />Environmental Protection Specialist <br />cc: William A. Bear (Bowie Resources LLC) <br />c:\word\bowie 1 \tr47adeg2 <br />2 <br />